Duration
48 months
Start Date
Apr 2026
Partners
5
Work Packages
Duration
Start Date
Partners
Work Packages
Management
Leader: CNRS — Inka Manek-Hönninger
Partners: All partners
Duration: M1 – M48
Coordinates the overall project, monitors deliverables and milestones, manages financial and legal reporting to the European Commission, and ensures transparent governance through a General Assembly, Management Team, and regular risk assessment sessions.
Optics
Leader: CRYTUR – Antin Fajstavr
Partners: CNRS, LASEA
Duration: M1 – M39
Designs and manufactures all custom optical components for 2 µm wavelength operation: beam telescopes, focusing lenses, axicons for Bessel-beam shaping, and anti-reflective coatings.
Laser systems
Leader: RUB/PULS – Prof. Clara Saraceno
Partners: CRYTUR, RAYVEN, CNRS
Duration: M1 – M27
Develops two complementary laser systems: (1) a single-pulse Ho-doped femtosecond prototype delivered by RAYVEN for early silicon processing studies, and (2) the first GHz-burst holmium amplifier at 2.1 µm developed by PULS group.
Integration
Leader: LASEA – David Bruneel
Partners: CNRS, RUB, RAYVEN, CRYTUR
Duration: M1 – M36
Designs and builds a full industrial-grade laser processing workstation integrating the RAYVEN laser prototype, galvo scanner, custom optics, and control software.
Material processing
Leader: CNRS — Inka Manek-Hönninger
Partners: RAYVEN, LASEA
Duration: M7 – M48
The scientific heart of the project. Conducts parametric drilling studies in silicon first with the single-pulse prototype, then with the GHz-burst system.
Dissemination
Leader: RAYVEN – Célia Millon
Partners: All partners
Duration: M1 – M48
Maximises the visibility and impact of STAY2ME through open-access publications, conference presentations, trade show participation, a project website, LinkedIn presence, and two major workshops — one in Bordeaux (M33) and one in Bochum (M46) — targeting researchers, industry stakeholders, investors, and students.